Changelog & Alerts for DCS Versions

Updates between Version 12-2023 and 03-2024

Sections that were updated

File LinkFile NameRev. InfoDate
Stormwater Management_DC (PDF)Stormwater Management Design CriteriaUpdated03/2024
Sustainable Requirements_DC (PDF)Sustainable Requirements Design CriteriaUpdated03/2024
UEM Typical P&ID Water Recovery Systems Spec Break Exhibit (PDF)UEM Typical P&ID Water Recovery Systems Spec Break ExhibitNew03/2024
Division 22.UEM - UEM Pipe Specification Tables (XLSX)Division 22.UEM - UEM Pipe Specification TablesUpdated03/2024
22.11.00 (PDF)Facility Water DistributionUpdated03/2024
22.20.00.UEM (PDF)UEM Water Recovery SystemsNew03/2024
23.81.26 (PDF)Ductless Split System Air ConditionersNew03/2024
26.05.53 (PDF)Electrical IdentificationNew03/2024
26.29.13 (PDF)Motor ControllersNew03/2024
Division 33.UEM - UEM Pipe Specification TablesDivision 33.UEM - UEM Pipe Specification TablesNew03/2024
33.09.60.3.UEM (PDF)UEM Differential Pressure TransmitterUpdated03/2024
33.14.00.UEM (PDF)UEM Water Utility DistributionNew03/2024
33.61.00.UEM (PDF)UEM Campus Hydronic Energy Distribution Piping and FittingsNew03/2024

Updates between Version 10-2023 and 12-2023

Sections that were updated

File LinkFile NameRev. InfoDate
Laboratory_DC (PDF)Laboratory Design CriteriaNew12/2023
Sustainable Requirements_DC (PDF)Sustainable Requirements Design CriteriaNew12/2023
Construction Waste Management_DC (PDF)Construction Waste Management Design CriteriaNew12/2023
01.35.23 (PDF)Project Safety Requirements - CIPNew12/2023
01.45.00 (PDF)Project Quality ControlNew12/2023
01.77.00.M (DOC)Project Closeout Procedures Deliverable MatrixUpdated12/2023
Division 22 DWS_DC (PDF)Domestic Water Systems Design CriteriaUpdated12/2023
22.10.17 (PDF)Natural Gas Piping and AppurtenancesUpdated12/2023
22.11.00.UEM (PDF)UEM Facility Water DistributionNew12/2023
22.20.00.23.UEM (XLS)UEM Div 22 Pipe Specification TablesNew12/2023
22.61.19 (PDF)Compressed-Air Equipment for Laboratory and Healthcare FacilitiesUpdated12/2023
23.07.16.UEM (PDF)UEM Equipment InsulationNew12/2023
23.07.19.UEM (PDF)UEM Piping InsulationNew12/2023
26.28.16 (PDF)Disconnect SwitchesNew12/2023
32 90 00 (PDF)Landscape PlantingUpdated12/2023
33.31.00.UEM (PDF)UEM Site Sanitary Sewerage PipingNew12/2023
33.42.00.UEM (PDF)UEM Site Storm Utility Drainage PipingNew12/2023
33.52.00.UEM (PDF)UEM Site Natural Gas Piping and AppurtenancesNew12/2023

Updates between Version 09-2023 and 10-2023

Sections that were updated

File LinkFile NameRev. InfoDate
01.56.39 (PDF)Tree Preservation, Transplant, and MitigationUpdated10/2023
01.79.00 (PDF)Demonstration and TrainingNew10/2023
23.82.13 (PDF)Fan Coil UnitsNew10/2023
27.51.29.17 (PDF)Emergency Responder Radio Communication Enhancement SystemNew10/2023

Updates between Version 06-2023 and 09-2023

Sections that were updated

File LinkFile NameRev. InfoDate
Texas Gas Service Typical P&ID and Natural Gas Spec Break ExhibitTexas Gas Service Typical P&ID and Natural Gas Spec Break ExhibitNew09/2023
UEM Typical P&ID Natural Gas Spec Break ExhibitUEM Typical P&ID Natural Gas Spec Break ExhibitNew09/2023
22.05.23 (PDF)General Valves for Plumbing PipingUpdated09/2023
22.10.17 (PDF)Natural Gas Piping and AppurtenancesUpdated09/2023
22.10.17.UEM (PDF)UEM Natural Gas Piping and AppurtenancesNew09/2023
22.11.00 (PDF)Facility Water DistributionUpdated09/2023
22.20.00 (PDF)Water Recovery and Rainwater Collection SystemsUpdated09/2023
22.30.00 (PDF)Plumbing EquipmentUpdated09/2023
22.40.00 (PDF)Plumbing FixturesUpdated09/2023
22.61.19 (PDF)Compressed Air Systems for Laboratory and Healthcare FacilitiesUpdated09/2023
23.05.23 (PDF)Valves for HVACUpdated09/2023
23.21.13 (PDF)Hydronic Piping and FittingsUpdated09/2023
23.22.13 (PDF)Steam and Condensate PipingUpdated09/2023
23.29.00 (PDF)Variable Frequency DrivesUpdated09/2023
23.57.00 (PDF)Heat ExchangersUpdated09/2023
23.73.00 (PDF)Indoor Air Handling UnitsUpdated09/2023
26.05.20 (PDF)2-Hour Fire-Rated Circuit SystemNew09/2023
28 46 24.25 (PDF)Area of Refuge Two-Way Communication SystemNew09/2023

Updates between Version 04-2023 and 06-2023

Sections that were updated

File LinkFile NameRev. InfoDate
Division 10 Specialties_DC (PDF)Specialties Design CriteriaUpdated06/2023
Division 12 Furnishings_DC (PDF)Furnishings Design CriteriaUpdated06/2023
08.08.00 (PDF)Commissioning of Openings (Fire Doors, Dampers and Other Opening Protectives)New06/2023
11.81.29 (PDF)Facility Fall Protection - ActiveNew06/2023
22.00.00 (PDF)Basic Plumbing RequirementsUpdated06/2023
22.62.19 (PDF)Laboratory Vacuum SystemsUpdated06/2023
28.00.00 (PDF)SecurityUpdated06/2023

Updates between Version 03-2023 and 04-2023

Sections that were updated

File LinkFile NameRev. InfoDate
Fire Alarm_DC (PDF)Fire Alarm Design CriteriaUpdated04/2023
10.41.16 (PDF)Emergency Key CabinetsUpdated04/2023
11.81.29 (PDF)Facility Fall Protection - PassiveNew04/2023
23.34.00 (PDF)HVAC FansUpdated04/2023
26.27.26 (PDF)Wiring DevicesNew04/2023
28.42.00 (PDF)Gas Detection and AlarmUpdated04/2023
28.46.24.23 (PDF)Other Fire Alarm Interfaces - Building Manager MicrophoneUpdated04/2023
28.47.00 (PDF)Mass Notification Systems - In-Building Mass NotificationUpdated04/2023

Updates between Version 11-2022 and 03-2023

Sections that were updated

File LinkFile NameRev. InfoDate
Fall Protection_DC (PDF)Fall Protection Design CriteriaNew03/2023
Commissioning_DC (PDF)Commissioning Design CriteriaNew03/2023
01.91.00 (PDF)CommissioningNew03/2023
26.41.13 (PDF)Lightning Protection for StructuresNew03/2023
28.01.80.71 (PDF)Revisions and Upgrades of Fire Detection and Alarm (Modifications of Existing FA Systems)Updated03/2023
28.46.00 (PDF)Fire Alarm and Signaling (New Systems)Updated03/2023
32.84.00 (PDF)Planting IrrigationUpdated03/2023

Updates between Version 9-2022 and 11-2022

Sections that were updated

File LinkFile NameRev. InfoDate
Div 06_WPC_DC (PDF)Woods, Plastics, and Composites Design CriteriaNew11/2022
Div 07_Thermal and Moisture Protection_DC (PDF)Thermal and Moisture Protection Design CriteriaUpdated11/2022
Div 22_PL_DC (PDF)Plumbing Design CriteriaUpdated11/2022
22.05.29 (PDF)Hangers and SupportsUpdated11/2022
22.05.53 (PDF)Plumbing IdentificationUpdated11/2022
22.13.00 (PDF)Facility Sanitary SewerageUpdated11/2022
22.14.00 (PDF)Facility Storm DrainageUpdated11/2022
22.40.00 (PDF)Plumbing FixturesUpdated11/2022
22.63.19 (PDF)Laboratory Gas SystemsUpdated11/2022
23.22.16 (PDF)Steam and Condensate SpecialtiesNew11/2022
23.22.16.UEM (PDF)UEM Steam and Condensate SpecialtiesNew11/2022
23.25.16.UEM (PDF)UEM Steam and Condensate Flush, Clean, and PassivationNew11/2022
UEM CHW with HEX Typical P&ID and Specification Break Exhibit (PDF)UEM CHW with HEX Typical P&ID and Specification Break ExhibitNew11/2022

Updates between Version 7-2022 and 9-2022

Sections that were updated

File LinkFile NameRev. InfoDate
Gender Inclusive Campus_DC (PDF)Gender Inclusive Campus Design CriteriaNew9/2022
Stormwater Management_DC (PDF)Stormwater Management Design CriteriaNew9/2022
UEM Sanitary Sewer Spec Break Exhibit (PDF)UEM Sanitary Sewer Spec Break ExhibitNew9/2022
08.11.13 (PDF)Hollow Metal Doors and FramesNew9/2022
23.05.23.UEM (PDF)UEM Hydronic, Steam, and Condensate ValvesNew9/2022
23.20.00.23.UEM (XLSX)UEM Pipe Specification TablesUpdated9/2022
23.22.13.UEM (PDF)UEM Steam and Condensate PipingNew9/2022
23.25.00 (PDF)HVAC Water TreatmentNew9/2022
23.74.00 (PDF)Packaged Air Handling UnitsNew9/2022
26.28.13 (PDF)Fuses, 600VoltsNew9/2022
27.41.16 (PDF)Integrated Audio-Video Systems and EquipmentNew9/2022
28.01.80.71 (PDF)Revisions and Upgrades of Fire Detection and Alarm (Modification of Existing FA Systems)New9/2022
28.46.00 (PDF)Fire Alarm and Signaling (New Systems)Updated9/2022

Updates between Version 6-2022 and 7-2022

Sections that were updated

File LinkFile NameRev. InfoDate
01.77.00 (PDF)Project Closeout ProceduresUpdated7/2022
01.77.00.M (DOC)Project Closeout Procedures Deliverables MatrixUpdated7/2022
Div08_Openings_DC (PDF)Division 08 Openings Design CriteriaUpdated7/2022
23.37.00 (PDF)Air Inlets and OutletsNew7/2022
23.51.00 (PDF)Breechings, Chimneys, and StacksNew7/2022
32.90.00 (PDF)Landscape PlantingUpdated7/2022

Updates between Version 5-2022 and 6-2022

Sections that were updated

File LinkFile NameRev. InfoDate
01.50.00 (PDF)Temporary Facilities and ControlsNew6/2022
22.00.00 (PDF)Basic Plumbing RequirementsUpdated6/2022
23.05.19.UEM (PDF)UEM Analog Meters and GaugesNew6/2022
23.22.23.UEM (PDF)UEM Steam Condensate PumpsNew6/2022
23.73.00 (PDF)Indoor Air Handling UnitsUpdated6/2022
26.27.26.UEM (PDF)UEM Wiring DevicesUpdated6/2022

Updates between Version 2-2022 and 5-2022

Sections that were updated

File LinkFile NameRev. InfoDate
07.84.00 (PDF)Firestopping of Penetrations, Joints, and Perimeter Fire BarriersNew5/2022
Div 07_Thermal and Moisture Protection_DC (PDF)Division 07 Thermal and Moisture Protection Design CriteriaNew5/2022
11.53.13 (PDF)Laboratory Fume HoodsNew5/2022
22.05.00Common Work Results for PlumbingRemoved5/2022
22.11.00 (PDF)Facility Water DistributionUpdated5/2022
Div 22_UEM_LWS_DC (PDF)Laboratory Water Service Design CriteriaNew5/2022
23.21.23.UEM (PDF)UEM Centrifugal PumpsUpdated5/2022
23.34.00 (PDF)HVAC FansUpdated5/2022
Div 23_Steam_Systems_DC (PDF)Steam Systems Design CriteriaUpdated5/2022
Div 23_UEM_Main Campus_CHWS_DC (PDF)UEM Main Campus Chilled Water Service Design CriteriaNew5/2022
Div 23_UEM_Main Campus_District Energy_HHWS_DC (PDF)UEM Main Campus District Energy Heating Hot Water Service Design CriteriaNew5/2022
26.05.19 (PDF)Cable Wire and Connectors, 600VNew5/2022
    

Updates between Version 1-2022 and 2-2022

Sections that were updated

File LinkFile NameRev. InfoDate
01.60.00 (PDF)Product RequirementsNew2/2022
23.09.23 (PDF)Direct Digital Control SystemsUpdated2/2022
Division 23 Airside Systems Design Criteria (PDF)Division 23 Airside Systems Design CriteriaUpdated2/2022
26.00.00 (PDF)Basic Electrical RequirementsUpdated2/2022
26.00.10 (PDF)Electrical DemolitionNew2/2022

Updates between Version 12-2021 and 1-2022

Sections that were updated

File LinkFile NameRev. InfoDate
23.22.13 (PDF)Steam and Condensate PipingNew1/2022
26.05.26 (PDF)GroundingNew1/2022

Updates between Version 11-2021 and 12-2021

Sections that were updated

File LinkFile NameRev. InfoDate
26.51.13 (PDF)Luminaires, Lamps and PolesUpdated12/2021
28.42.00 (PDF)Gas Detection and AlarmNew12/2021
UEM Steam and Steam Condensate Typical P&ID and Spec Break (PDF)UEM Steam and Steam Condensate Typical P&ID and Specification Break ExhibitNew12/2021
UEM CHW WO HX Typical P&ID and Spec Break (PDF)UEM CHW WO HX Typical P&ID and Specification Break ExhibitNew12/2021

Updates between Version 9-2021 and 11-2021

Sections that were updated

File LinkFile NameRev. InfoDate
Div 01 (PDF)General RequirementsUpdated11/2021
01.32.00 (PDF)Construction Progress DocumentationNew11/2021
Div22_MGS_DC (PDF)Medical Gas Systems Design CriteriaNew11/2021
23.09.13.13.UEM (PDF)UEM Electrical ActuatorsUpdated11/2021
23.21.13.A.UEM (PDF)UEM Requirements for Water Treatment for Hydrostatic Testing of New Piping SystemsUpdated11/2021
23.21.23.UEM (PDF)UEM Centrifugal PumpsUpdated11/2021
27.00.00 (PDF)Communications - System Design, Construction and Commissioning GuideUpdated11/2021
27.05.26 (PDF)Grounding and Bonding for CommunicationsUpdated11/2021
27.05.29 (PDF)Hangers and Supports for CommunicationsUpdated11/2021
27.05.36 (PDF)Cable Trays for Communications SystemsUpdated11/2021
27.05.37 (PDF)Firestopping Systems for Communications CablingUpdated11/2021
27.08.10 (PDF)Optical Fiber Testing and MeasurementsUpdated11/2021
27.08.20 (PDF)Copper TestingUpdated11/2021
27.11.00 (PDF)Communications Equipment Room FittingsUpdated11/2021
27.11.19 (PDF)Communications Termination Blocks and Patch PanelUpdated11/2021
27.13.23 (PDF)Communications Optical Fiber Backbone CablingUpdated11/2021
27.15.43 (PDF)Communications Faceplates and Modular JacksUpdated11/2021
27.51.29 (PDF)Emergency Call SystemsUpdated11/2021
33.09.00.UEM (PDF)UEM Meters, Submeters, and Instrumentation for UtilitiesUpdated11/2021
33.09.60.1.UEM (PDF)UEM Magnetic Flow MetersUpdated11/2021
33.09.60.2.UEM (PDF)UEM Pressure TransmitterUpdated11/2021
33.09.60.3.UEM (PDF)UEM Differential Pressure TransmitterUpdated11/2021
33.09.60.4.UEM (PDF)UEM Temperature TransmitterUpdated11/2021
UT Desirable Tree ListUT Desirable Tree ListNew11/2021

Updates between Version 8-2021 and 9-2021

Sections that were updated

File LinkFile NameRev. InfoDate
Codes and Standards (PDF)Codes and StandardsUpdated9/2021
01.31.00.CIP (PDF)Project Administration - CIPNew9/2021
01.31.00.Non-CIP (PDF)Project Administration - Non-CIPNew9/2021
10.44.16 (PDF)Portable Fire Extinguishers, Cabinets and AccessoriesNew9/2021
23.33.33 (PDF)Duct AccessoriesNew9/2021

Updates between Version 7-2021 and 8-2021

Sections that were updated

File LinkFile NameRev. InfoDate
Div22_PL_DC (PDF)Plumbing Design CriteriaNew8/2021
23 20 00.23.UEM (XLSX)UEM Pipe Specification TablesUpdated8/2021
23 21 13 (XLS)Pipe Specification TablesRemoved8/2021
26.05.33 (PDF)Raceway, Conduit and BoxesNew8/2021
Campus ConditionsCampus ConditionsRemoved8/2021

Updates between Version 4-2021 and 7-2021

Sections that were updated

File LinkFile NameRev. InfoDate
23.05.13.UEM (PDF)UEM MotorsUpdated7/2021
23.05.53 (PDF)Identification for HVAC Piping and EquipmentUpdated7/2021
23.21.13.A.UEM (PDF)UEM Requirements for Water Treatment for Hydrostatic Testing of New Piping SystemsUpdated7/2021
23 .21.13.B.UEM (PDF)UEM Procedures for Cleaning, Passivating, & Final Treatment of Chilled & Hot Water PipingUpdated7/2021
Div23_HVAC_SOO_DC (PDF)HVAC Controls Sequences of Operations Design CriteriaUpdated7/2021
26.05.43.UEM (PDF)UEM Underground Ducts and ManholesUpdated7/2021
26.13.19.UEM (PDF)UEM 15KV Metal-Clad SwitchgearUpdated7/2021
28.00.00 (PDF)SecurityUpdated7/2021
32.84.00 (PDF)Planting IrrigationUpdated7/2021
33.09.00.UEM (PDF)UEM Meters, Submeters, and Instrumentation for UtilitiesNew7/2021
33.12.15.UEM (PDF)UEM Direct-Buried Butterfly ValvesUpdated7/2021
Standard Operating Procedure for Dye Testing (PDF)Standard Operating Procedure for Dye TestingNew7/2021

Updates between Version 1-2021 and 4-2021

Sections that were updated

File LinkFile NameRev. InfoDate
01.35.23 (PDF)Project Safety RequirementsNew4/2021
Div 09_Finishes_DC (PDF)Division 09 Finishes Design CriteriaNew4/2021
09 Finishes09 FinishesRemoved4/2021
22.05.48 (PDF)Vibration Isolation for PlumbingNew4/2021
22.63.13 (PDF)Medical Gas SystemsNew4/2021
23.20.00 (PDF)HVAC Piping and PumpsUpdated4/2021
Div 27_Ext_Elect_Device_DC (PDF)Exterior Electrified Device Design CriteriaNew4/2021

Updates between Version 10-2020 and 1-2021

Sections that were updated

File LinkFile NameRev. InfoDate
01.56.39 (PDF)Tree Preservation and ProtectionNew1/2021
22.05.13 (PDF)Common Motor Requirements for Plumbing EquipmentNew1/2021
22.62.19 (PDF)Laboratory Vacuum SystemsNew1/2021
Div 23_CHWS_DC (PDF)Chilled and Hot Water Systems Design GuidelineUpdated1/2021
23.05.93 (PDF)Testing, Adjusting and BalancingUpdated1/2021
23.21.23.UEM (PDF)UEM Centrifugal PumpsUpdated1/2021
Main Campus CHW Service Design Specifications (PDF)Main Campus CHW Service Design SpecificationsUpdated1/2021
Div 26_Electrical_Systems (PDF)Electrical Systems Design GuidelineUpdated1/2021
26.05.00 (PDF)Common Work Results for ElectricalNew1/2021
26.05.29 (PDF)Hangers and Supports for Electrical SystemsNew1/2021
26.05.43.UEM (PDF)UEM Underground Ducts and ManholesUpdated1/2021
26.22.13 (PDF)Low-Voltage Distribution Transformers`New1/2021
Campus ConditionsCampus ConditionsUpdated1/2021

Updates between Version 6-2020 and 10-2020

Sections that were updated

File LinkFile NameRev. InfoDate
22.05.33 (PDF)Heat Tracing for Plumbing PipingNew10/2020
23.21.13.UEM (PDF)UEM Piping and ValvesUpdated10/2020
23.21.23.UEM (PDF)UEM Centrifugal PumpsUpdated10/2020
26.00.00 (PDF)Basic Electrical RequirementsNew10/2020
26.05.43.UEM (PDF)Underground Ducts and ManholesUpdated10/2020
26.09.23 (PDF)Lighting Control DevicesUpdated10/2020
26.24.16 (PDF)Panelboards - Distribution and Branch CircuitNew10/2020

Updates between Version 1-2020 and 6-2020

Sections that were updated

File LinkFile NameRev. InfoDate
01.57.23 (PDF)Temporary Storm Water Pollution ControlUpdated06/2020
01.77.00 (PDF)Project Closeout ProceduresNew06/2020
01.77.00M (PDF)Project Closeout Procedures Deliverables MatrixNew06/2020
22.05.29 (PDF)Hangers and SupportsNew06/2020
22.11.00 (PDF)Facility Water DistributionUpdated06/2020
22.13.00 (PDF)Facility Sanitary SewerageUpdated06/2020
23.05.13 (PDF) Common Motor Requirements for HVAC EquipmentNew06/2020
23.21.26 (PDF)Hydronic SpecialtiesNew06/2020

Updates between Version 12-2019 and 1-2020

Sections that were updated

File LinkFile NameRev. InfoDate
01.57.23 (PDF)Temporary Storm Water Pollution ControlNew1/2020
23.09.23 (PDF)Direct Digital Control SystemsUpdated1/2020

Updates between Version 10-2019 and 12-2019

Sections that were updated

File LinkFile NameRev. InfoDate
23.72.00 (PDF)Air-to-Air Energy Recovery EquipmentNew12/2019
(PDF)   (DOC)Energy and Water Performance Information RequestUpdated12/2019

Updates between Version 8-2019 and 10-2019

Sections that were updated

File LinkFile NameRev. InfoDate
23.05.19 (PDF)Manual Meters and GaugesUpdated10/2019
26.05.73 (PDF)UEM Standard - Fault and Coordination Study and Arc Flash Hazard AnalysisUpdated10/2019

Updates between Version 5-2019 and 8-2019

Sections that were updated

File LinkFile NameRev. InfoDate
22.13.19 (PDF)Plumbing SpecialtiesNew09/2019
23.10.00 (PDF)Facility Fuel SystemsUpdated09/2019
26.09.23 (PDF)Lighting Control DevicesNew09/2019
LinkFood Establishment GuidelinesNew09/2019
22.11.00 (PDF)Facility Water DistributionUpdated09/2019

Updates between Version 3-2019 and 5-2019:

Sections that were updated:

File LinkFile NameRev. InfoDate
22.61.19 (PDF)Compressed Air SystemsNew05/2019

Updates between Version 2-2019 and 3-2019

Sections that were updated

File LinkFile NameRev. InfoDate
22.63.19 (PDF)Lab Gas SystemsNew04/2019

Updates between Version 11-2018 and 2-2019

Sections that were updated

File LinkFile NameRev. InfoDate
22.66.00 (PDF)Lab Waste SystemsNew02/2019
22.67.13 (PDF)Laboratory and Deionized Water SystemsNew02/2019
22.67.13.19Laboratory and Deionized Water SystemsRemoved02/2019

Updates between Version 10-2018 and 11-2018:

Sections that were updated:

File LinkFile NameRev. InfoDate
Div08_DG (PDF)Division 08 Openings Design GuidelineNew11/2018
22.07.19 (PDF)Plumbing Piping InsulationNew11/2018

Updates between Version 9-2018 and 10-2018

Sections that were updated

File LinkFile NameRev. InfoDate
Div14_CE_DG (PDF)Conveying Equipment Design GuidelineNew11/2018
22.13.00 (PDF)Facility Sanitary SewerageUpdated11/2018
22.14.00 (PDF)Facility Storm DrainageNew11/2018

Updates between Version 8-2018 and 9-2018

Sections that were updated

File LinkFile NameRev. InfoDate
21.00.00 (PDF)Basic Fire Protection RequirementsUpdated10/2018
21.00.10Standpipe SystemsRemoved10/2018
21.05.13 (PDF)Motor Requirements for Fire Suppression EquipmentUpdated10/2018
21.05.23 (PDF) General Valves for Fire Suppression PipingNew10/2018
21.05.29 (PDF)Fire Protection Hangers and SupportsNew10/2018
21.05.53 (PDF) Fire Protection Piping and EquipmentNew10/2018
21.10.00 (PDF) Fire Suppression SystemsUpdated10/2018
21.20.00 (PDF)Chemical Fire Extinguishing SystemsUpdated10/2018
21.30.00 (PDF) Fire Pump/Jockey PumpUpdated10/2018
21.40.00 (PDF)UT Jockey Pump DetailRev. Date Updated 

Updates between Version 6-2018 and 8-2018

Sections that were updated

File LinkFile NameRev. InfoDate
23.07.00 (PDF)General HVAC Insulation RequirementsNew08/2018
23.07.13 (PDF)Ductwork InsulationNew08/2018
23.07.16 (PDF)HVAC Equipment InsulationNew08/2018
23.07.19 (PDF)HVAC Piping InsulationNew08/2018
ITS Room Readiness ChecklistITS Room Readiness ChecklistNew08/2018
23.09.23 (PDF)Direct Digital Control SystemsUpdated08/2018
HVAC Controls Sequences of Operations Guideline for New Construction and Major Renovations (PDF)HVAC Controls Sequences of Operations Guideline for New Construction and Major Renovations Updated08/2018
26.00.00 (PDF)General ElectricalUpdated08/2018
23.21.13 (XLS)Pipe Specification TablesUpdated08/2018

Updates between Version 5-2018 and 6-2018

Sections that were updated

File LinkFile NameRev. InfoDate
23.57.00 (PDF)Heat ExchangersNew07/2018
23.62.00 (PDF)Packaged DX Air ConditionersNew07/2018

Updates between Version 3-2018 and 5-2018

Sections that were updated

File LinkFile NameRev. InfoDate
23.34.00 (PDF)HVAC FansUpdated06/2018
23.41.00 (PDF)Particulate Air FiltrationNew06/2018

Updates between Version 2-2018 and 3-2018

Sections that were updated

File LinkFile NameRev. InfoDate
23.29.00 (PDF)Variable Frequency DrivesNew03/2018
23.31.00 (PDF)DuctworkUpdated03/2018
26.51.13 (PDF)Luminaires, Lamps and PolesNew03/2018

Updates between Version 12-2017 and 2-2018

Sections that were updated

File LinkFile NameRev. InfoDate
23.05.93 (PDF)Testing Adjusting and BalancingNew02/2018
23.05.93.13 (PDF)System Preparation for Testing, Adjusting and BalancingNew02/2018

Updates between Version 11-2017 and 12-2017

Sections that were updated

File LinkFile NameRev. InfoDate
23.36.00 (PDF)Air Terminal UnitsUpdated12/2017

Updates between Version 10-2017 and 11-2017

Sections that were updated

File LinkFile NameRev. InfoDate
23.21.13 (PDF)Hydronic Piping and FittingsNew11/2017
Div28_FA_DG (PDF)Fire Alarm Design GuidelineUpdated11/2017
Sequences of Operation Guideline (PDF)New 11/2017
Org_Project_Manual (PDF)Organization of Project ManualNew11/2017
Sub_Req_Design_Doc (PDF)Submittal Requirements for Design DocumentsNew11/2017

Updates between Version 9-2017 and 10-2017

Sections that were updated

File LinkFile NameRev. InfoDate
23.21.23 (PDF)Hydronic PumpsNew10/2017
28.46.00 (PDF)Fire Alarm and SignalingUpdated10/2017
28.31.90.pdfEmergency Communication System PanelRemoved08/2013

Updates between Version 8-2017 and 9-2017

Sections that were updated

File LinkFile NameRev. InfoDate
28.39.00 (PDF)In-Building Mass Notification SystemsNew09/2017
23.05.23 (PDF)Valves for HVACNew09/2017
23.05.29 (PDF)Hangers and Supports for HVAC Piping and EquipmentNew09/2017

Updates between Version 7-2017 and 8-2017

Sections that were updated

File LinkFile NameRev. InfoDate
23.73.00 (PDF)Indoor Air Handling UnitNew08/2017
28.00.00 (PDF)SecurityUpdated08/2017
28.31.63 (PDF)Fire Alarm Integrated Audio Evac Systems - Building Manager MicNew08/2017
Div_23_Airside_Systems (PDF)Airside Systems Design GuidelineNew08/2017
Div_23_Steam_Systems (PDF)Steam Systems Design GuidelineNew08/2017
Div_26_Electrical_Systems (PDF)Division 26 Electrical Systems Design GuidelineNew08/2017

Updates between Version 6-2017 and 7-2017

*Alert: This updated version of the Design and Construction Standards (version 7-2017) will apply *retroactively* to the Energy Engineering Building project and the Creekside Residence Hall project.

Sections and Divisions that were updated

File LinkFile NameRev. InfoDate
10.41.16 (PDF)Emergency Key CabinetsNew - Added to Division 10 and Division 2807/2017
22.13.00 (PDF)Facility Sanitary SewerageUpdated07/2017
23.09.23 (PDF)Direct Digital Control SystemsNew07/2017
23.09.43 (PDF)Pneumatic Control System for HVACMoved/Renamed - Moved from Division 25 to Division 2307/2017
Div23_CHWS_DG (PDF)Chilled and Hot Water Systems Design GuidelineNew07/2017
Division 25Integrated AutomationRemoved07/2017
23.09.00.pdfInstrumentation and Controls for HVACRemoved07/2017

Updates between Version 4-2017 and 6-2017

Sections that were updated

File LinkFile NameRev. InfoDate
21.05.13 (PDF)Motor Requirements for Fire Suppression EquipmentNew06/2017
22.05.23 (PDF)General Valves for Plumbing PipingNew06/2017
23.00.00 (PDF)Basic HVAC RequirementsUpdated06/2017
28.00.00 (PDF)SecurityUpdated06/2017

Updates between Version 2-2017 and 4-2017

Sections that were updated

File LinkFile NameRev. InfoDate
Div21_FSS_DG (PDF)Fire Suppression SystemsNew04/2017
22.05.53 (PDF)Plumbing IdentificationNew04/2017
22.10.23 (PDF)Plumbing PumpsNew04/2017
22.20.00 (PDF)Water RecoveryReplaced 22 20 0304/2017
Div22_WRS_DG (PDF)Water Recovery Systems Design GuidelineNew04/2017
27.51.29 (PDF)Emergency Call SystemsNew04/2017
28.46.00 (PDF)Fire Alarm and SignalingReplaced 28 31 0004/2017
Div28_FA_DG (PDF)Fire Alarm Design GuidelineNew04/2017

Updates between Version 9-2016 and 2-2017

*Alert: This updated version of the Design and Construction Standards (version 2-2017) will apply retroactively to the Energy Engineering Building project and the Creekside Residence Hall project.

The Utilities and Energy Management Standards were added to Divisions 23, 26, and 33.

Sections that were updated

File LinkFile TitleDate
Div22_DWS_DG (PDF)Domestic Water Systems Design Guideline03/2017
Div22_NGS_DG (PDF)Natural Gas Systems Design Guideline03/2017
22.00.00 (PDF)Basic Plumbing Requirements03/2017
22.30.00 (PDF)Plumbing Equipment03/2017
22.40.00 (PDF)Plumbing Fixtures03/2017
22.10.17 (PDF)Natural Gas Piping and Appurtenances03/2017
22.11.00 (PDF)Facility Water Distribution03/2017
22.30.00.docPlumbing Equipment03/2017
22.40.00 (PDF)Plumbing Fixtures03/2017
27.08.20 (PDF)Copper Testing03/2017
27.11.00 (PDF)Communications Rooms03/2017
27.11.13 (PDF)Communications Entrance Protection03/2017
27.11.19 (PDF)Communications Termination Blocks and Patch Panels03/2017
27.13.23 (PDF)Communications Optical Fiber Backbone Cabling03/2017
27.15.13 (PDF)Communications Copper Horizontal Cable03/2017
27.15.43 (PDF)Communications Faceplates and Modular Jacks03/2017
27.16.19 (PDF)Telecommunications Patch Cords, Station Cords, and Cross Connect Wires03/2017
28.00.00 (PDF)Security - General10/2016