The University of Texas at Austin
Contact Us | For Staff

Design and Construction Standards / Division 22 - PLUMBING

The University of Texas at Austin Design and Construction Standards have been prepared by the University to guide and assist architects, engineers, other design professionals, contractors, and university staff (herein referred to as Professional) in understanding the preferences of The University of Texas at Austin in the development, maintenance, repair and replacement of its facilities and assets.

If you wish to download multiple files, you may do so by going to the PMCS Design and Construction Standards UT BOX Site. 

 

Division 22 - Design Guidelines

File Link
Word File Link
File Title
Version No.
Updates Made
Rev. Date
Div22_DWS_DG.pdf Div22_DWS_DG.doc Domestic Water Systems Design Guideline 8-2017 Update 03/2017
Div22_NGS_DG.pdf Div22_NGS_DG.doc Natural Gas Systems Design Guideline 8-2017 Update 03/2017
Div22_WRS_DG.pdf Div22_WRS_DG.doc Water Recovery Systems Design Guideline 8-2017 Update 04/2017
 

Division 22 - Technical Specifications

File Link
Word File Link
File Title
Version No.
Updates Made
Rev. Date
22.00.00.pdf 22.00.00.doc Basic Plumbing Requirements 8-2017 Update 03/2017
22.05.00.pdf   Common Work Results for Plumbing 8-2017 None 04/2012
22.05.23.pdf 22.05.23.doc General Valves for Plumbing Piping 8-2017 Update 06/2017
22.05.53.pdf 22.05.53.doc Plumbing Identification 8-2017 Update 04/2017
22.07.00.pdf   Plumbing Insulation 8-2017 None 04/2012
22.10.00.pdf   Plumbing Piping and Pumps 8-2017 None 04/2012
22.10.17.pdf 22.10.17.doc Natural Gas Piping and Appurtenances 8-2017 Update 03/2017
22.10.23.pdf 22.10.23.doc Plumbing Pumps 8-2017 Update 04/2017
22.11.00.pdf 22.11.00.doc Facility Water Distribution 8-2017 Update 03/2017
22.13.00.pdf 22.13.00.doc Facility Sanitary Sewerage 8-2017 Update 07/2017
22.20.00.pdf 22.20.00.doc Water Recovery 8-2017 Update 04/2017
22.30.00.pdf 22.30.00.doc Plumbing Equipment 8-2017 Update 03/2017
22.40.00.pdf 22.40.00.doc Plumbing Fixtures 8-2017 Update 03/2017
22.67.13.19.pdf   Laboratory and Deionized Water Systems 8-2017 None 04/2012
 

Division 22 - Supplemental Documents

File Links
 
Updates Made
Rev. Date
Pipe Testing Procedure (formerly Appendix V)   None 09/2008
Energy Performance Information Request   None 04/2017
Building Automation Systems Communication Architecture Standards   None 04/2017
Commissioning Scope Services Deliverables   None 04/2017
Design & Construction Standard Detail Drawings   None 04/2017
Non-Routine Discharge Guidance   None 06/2017